Quantcast
Channel: All About Belgaum
Viewing all articles
Browse latest Browse all 8257

First gate has a RoB with a subway planned

$
0
0

First gate has a RoB with a subway planned

Railway Level Crossing No:383 which is the 1st Gate at Tilakwadi, the Railways have already made an outlay of 8.68 crores in 2013-15 in its annual budget.
The entire cost of the Railway over bridge wit ha subway is estimated to be Rs. 6,35,46,000.

First Railway Gate
First Railway Gate belagavi

Recently MP Angadi had visited the spot along with Railways and civic authorities and examined how the same would be executed.

Angadi also has aksed the railway authorities to finish the work Railway Level Crossing No:385 which is Kapileshwar before April 2016.
When the same will materialize is not known. 


 

Railway Level Crossing No:383 is 1st Gate
Railway Level Crossing No:382 is 2nd gate
Railway Level Crossing No:381 is 3rd Gate
Railway Level Crossing No:385 is Kapileshwar

All About Belgaum


Viewing all articles
Browse latest Browse all 8257