Belgaum to get underground electric cables

$
0
0

Belgaum to get underground electric cables

ugcable

Project will take 18 months for implementation
Underground lines reduce interruptions in power supply

HESCOM is working on laying underground (UG) cables in Belgaum city to prevent dangling wires, which pose danger to residents, especially during the monsoon. This Project envisages for Conversion of existing 11 KV Over Head Line to UnderGround cable system in Belgum City. The entire cost of the project is Rs.239.3 Crores.

The total length of the trunk line is 230 kms and that of the Loop line is 703 kms. The Conversion of existing 11 KV Over Head Line to UG cable system in Belgaum City is likely to be commenced by the first quarter of the 2015. The tender for the same has been floated. The Completion & Commissioning period is 18 months( Excluding Monsoon) from the date of issue of order.

SCOPE OF WORK:

  1. Laying of 3CX240Sqmm and 3CX95 Sq.mm HT. XLPE UG Cable for Looping of existing DTC’s between the Proposed RMUs.
  2. Laying of 3CX400Sq mm XLPE HT UG Cable for 11kV Trunk lines.
  3. Providing 11kV Class VCB Type MEI Make Compact RMU’s at the following locations.

After replacing overhead power lines would result in reducing the number of interruptions in power supply due to falling of trees, overturning of poles and snapping of power conductors. Also it was possible to reduce the energy losses by switching over to underground cables.

 

Trunk Line Length of Trunk line 400sq mm (in Km) Cost of Estimate Part- A Trunk line Rs. In Lacs No. of RMUs Cost of Estimate Part- B RMUs Rs. In Lacs Length of loop line (in Km) Cost of Estimate (Loop)95Sq.mm Rs. In Lacs Total Cost of Estimate (Trunk+RMU+Loops) Rs. In Lacs DTCs covered
          95 sqmm      
F5 Vadgoan from 110KV Vadgaon to 110KV Suvarna Soudha 12.5 406.72 4 57.01 20.3 382.51 846.23 62
F3 Adarsh Nagar from 110KV Vadgaon to F3 Hindwadi from 33KV RM2 12 393.43 7 99.72 40 731.11 1224.26 92
F8 Shahapur from 33KV RM2 to f4 Bazar galli from 110KV Vadgaon 12.1 396.84 10 142.44 50 937.11 1476.39 146
Tilakwadi to Guruprasad Colony 13.35 431.05 7 99.72 78.6 1495.71 2026.48 261
NANAWADI + BHAVANI NAGAR 10.7 356.97 6 85.48 32.6 584.96 1027.42 60
F5-DUCH + F1- UDYAMBAG 7.5 267.71 7 99.72 18.6 357.01 724.44 65
KLE + VIDYA NAGAR 11.5 379.05 7 99.72 19.3 365.2 843.97 61
GIT + HULIYAR 6 225.88 6 85.48 26.8 516.99 828.35 98
ARUN + PHADKE 4.2 175.7 6 85.48 9 183.55 444.73 46
BEMCO + UDHYAMBAG 5.1 200.96 7 99.72 12 239.16 539.84 54
MAJGAON + SHANTI IRON 3.1 144.09 2 28.53 9.2 162.49 335.1 13
F2 BHAGYA NAGAR + F3 RPD 9.8 332.28 8 113.96 53.16 1021.69 1467.93 190
Shree Nagar + Shivalaya + Auto Indl. 6.2 232.13 6 85.48 27 573.3 890.91 171
Hindalco + Yamnapur 9.8 331.18 5 71.24 16.6 318.03 720.46 58
Shivaji Nagar + Shettygalli 4.9 195.46 7 99.72 20.2 397.74 692.92 85
Vaibhav Nagar + hanuman Nagar 7.4 264.96 6 85.48 21.9 446.78 797.22 114
Kanbargi + Fort 7.1 256.08 4 57.01 13.4 276.56 589.65 74
Mahantesh Nagar + Ramthirth Nagar 5.9 223.78 6 85.48 14.9 313.18 622.45 90
Sadashiv Ngr + Hanuman Nagar 7.5 267.93 7 99.72 27.2 565.71 933.36 156
Civil Hospital + City 7.9 279.56 9 128.2 29.5 603.14 1010.91 155
Azad Ngr + Hosur 7.1 256.52 6 85.48 20.1 372.47 714.48 53
Dharwad Rd + Suvarna Soudha 8.9 306.35 4 57.01 11.2 205.06 568.42 26
Old Belgaum + Suvarna Soudha 7.8 275.62 4 57.01 17 310.04 642.67 38
Basavan Kudachi + Suvarna Soudha 17.8 554.73 5 71.24 18.3 328.68 954.66 34
Fort Road + Patil Galli 6.1 228.41 5 71.24 16.6 315.21 614.87 54
Khade Bazar + Maruti Galli 9.5 323.27 5 71.24 15.9 312.39 706.9 66
Cantonment + Sahayadri Nagar 9.1 313.4 11 156.68 64.2 1215.37 1685.45 205
  230.85 8020.05 167 2379.26 703.56 13531.15 23930.46 2527